Agenda item

5, 7, 9, 11, 13, 15, 17 & 19 Passmore Street, London, SW1W 8HR and 11 & 19 Passmore Street, London, SW1W 8HR

Minutes:

5, 7, 9, 13, 15 and 17 Passmore Street

 

Demolition and rebuilding behind retained front facade and party walls with alterations to front fenestration, provision of a new basement, mansard roof, extensions at rear ground and first floor level and installation of air source heat pump in rear basement lightwell. (Applications 1, 2, 3, 5, 6 and 7)

 

11 and 19 Passmore Street

 

Alterations to front fenestration, the provision of a new basement, mansard roof, extensions at rear ground and first floor level and installation of air source heat pump in rear basement lightwell. (Applications 4 and 8)

 

 

The Planning Officer had circulated the following revision to the wording of Condition 12:

 

Applications 1-8

 

Revision to wording of condition 12

 

Pre Commencement Condition.

 

You must carry out a detailed reclamation audit and apply to us for approval of the audit including the following parts:

 

1.                                  The reclamation audit should identify any building materials and products presenting a high reuse potential. The audit should also list any other reusable building elements. The inventory should present as much information as possible on the dimensions, quantities, conditions, environmental impact, technical characteristics, disassembly Item No. 3 13 14 recommendations, etc of the materials and products identified. If an existing concrete frame is present a specialist should investigate the quality of the recycled concrete aggregates and their re-usability potential before full demolition is considered. If windows are present, they should be dismantled first and sent to glass recyclers for clear glass cullet production (minimising contamination).

 

2.                                  Based on the audit, the design team should demonstrate that any new-built project is designed incorporating at least 20% by material mass/volume for the whole building to derive from re-used or recycled content.

 

3.                                  For any materials that are not re-used on-site, but identified as having re-use potential, the design team should advertise the availability of these potentially reusable materials to reclamation professionals (such as the Excess Material Exchange platform led by Enfield Council, Globchain or RE:London) and other interested parties who will contribute to the effective circulation of the elements. Meeting minutes from attending a 'Circular Economy surgery' or workshop with such platforms will be sufficient.

 

 

4.                                  All proposals, including retrofit of existing building elements, should prioritise sustainable material procurement, sourcing products with high recycled content or construction materials with a circular business model (take-back schemes etc).

 

You must not start any demolition works until we have approved what you have sent us. You must then carry out the works according to these details.

 

Alexander Lewis, representing Tribeca Holdings, addressed the Sub-Committee in support of the application.

 

Alan Coleman, representing Tyler Parkes, addressed the Sub-Committee in objection to the application.

 

Michael Phillips addressed the Sub-Committee in objection to the application.

 

RESOLVED UNANIMOUSLY

 

Application 1

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

 

Application 2

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

Application 3

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

Application 4

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

Application 5

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

Application 6

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

Application 7

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

 

Application 8

That conditional permission be granted - subject to completion of a legal agreement to secure the following:

i)                ensuring that the building contract entered into by the owners of the buildings at 5 to 19 Passmore Street requires that the construction works (to build the mansards and alterations to front facade) are carried out as a single operation; and

ii)                cost of monitoring of this agreement.

 

2.  That if the S106 legal agreement in respect of Applications 1-8 had not been completed within six weeks of the date of the Committee’s resolution, then:

a) The Director of Town Planning and Building Control shall consider whether it would be possible and appropriate to issue the permission with additional conditions attached to secure the benefits listed above. If so, the Director of Town Planning and Building Control was authorised to determine and issue the decision under Delegated Powers; however, if not;

b) The Director of Town Planning and Building Control shall consider whether the permission should be reused on the grounds that the proposals were unacceptable in the absence of the benefits which would have been secured; if so, the Director of Town Planning and Building Control was authorised to determine the application and agree appropriate reasons for refusal under Delegated Powers.

 

Supporting documents: