Minutes:
1 SITE COMPRISING 53-63 NEW BOND STREET - 5-17 - 17A BROOK STREET, LONDON, W1S 1RJ
Alteration and extension of the existing buildings, including partial demolition and retention and retrofit to provide a building with basement, ground and ten upper floors, setback at fifth to eighth floors with terraces, setback at ninth floor with terrace and plant, and a roof terrace with lift over run and pavilion at the tenth floor, with satellite dish, green roof and solar photo voltaic panels on its roof, and associated works, to provide for retail (Class E (a)) and office (Class E(g)(i)) uses together with associated ancillary spaces to those uses.
Late representations were received from Lazari Investments (28.03.2024).
The Presenting Officer tabled the following amendments to the recommendation and the recommended conditions:
Recommendation
1. Grant conditional permission subject to the views of the Mayor of London and subject to a S106 legal agreement to secure the following planning obligations:…
a) A financial
contribution of £150,480 £157,280 (index
linked) towards the carbon Off Set Fund (payable prior to the
commencement of the development);
[rest of recommendation as set out in the report]
Revised Planning Conditions:
10 - Before any demolition or excavation is carried out at or below the level of the floor in the basement, you must:
(a) apply to us for approval of a written scheme of investigation for a programme of archaeological work as agreed by the Greater London Archaeological Advisory Service (GLAAS). This must include details of the approved methodology and the suitably qualified person or organisation that will carry out the archaeological work. You must not start work until we have approved in writing what you have sent us.
[rest of condition as set out in the report]
22 – The
development shall be carried out in accordance with the approved
Energy Strategy (prepared by Buro Happold; dated November 2023 and
subsequent revision) and shall achieve regulated carbon dioxide
emission savings of not less than 25% 22% for
emissions beyond the Target Emissions Rate of Part L of Building
Regulations 2021, and of not less than 64% 63% for
emission beyond Notional specification for existing buildings. The
energy efficiency and sustainability measures set out there in
shall be completed and made operational prior to the first
occupation of the development and retained for the lifetime of the
development. (C17CA)
31 - No development (with the exception of demolition and temporary works) shall commence until hydraulic flood modelling drainage calculations, planning drawings and design drawings (including any flooding that occurs when taking into account climate change for the 1 in 100 critical storm event)are submitted and approved by the Local Authority, to demonstrate that the proposed development will not impact upon wider drainage network.
41 Details of the
precise scope of the extent
of the parts of the buildings to be retained and the method
for securing and lifting the retained parts of the building,
including structural alterations and deconstruction etc, must be
submitted for our approval before any structural demolition works
commence.
Deleted condition [unnecessary with condition 24 attached]
23 - You must
apply to us for our written approval of an independent review of
the energy efficiency measures to be provided within the
development before you start any work on the development. In the
case of an assessment using Building Research Establishment methods
('BREEAM'), this review must show that you have achieved an
'excellent' rating. If you use another method, you must achieve an
equally high standard. You must provide all the energy efficiency
measures referred to in the review before you start to use the
building. You must then permanently retain these features.
(C44BB)
Additional Planning Conditions
Replacement Condition 23
You must provide the following sustainability features as shown on the approved drawings before occupation of any part of the new building:
- air source heat pumps;
- photovoltaic panels;
- allowance for connections to any future heat network in the vicinity of the site.
Reason: To make sure that the development provides the environmental sustainability features included in your application as set out in Policies 36 and 38 of the City Plan 2019 – 2040 (April 2021). (R44AD)
43. The flat roof/terraced area at rear first floor level adjacent to 22 Hanover Square (excluding the side return on the south side of the site) shall not be used for sitting out or for any other purpose. You can however use the roof for maintenance purposes or to escape in an emergency.
Reason: To protect the privacy and environment of people in neighbouring properties. This is as set out in Policies 7, 33 and 38 of the City Plan 2019 – 2040 (April 2021).
Len Lazari, representing Lazari Investments, addressed the Sub-Committee in support of the application.
Patrick Campbell, representing Foster & Partners Riverside, addressed the Sub-Committee in support of the application.
RESOLVED UNANIMOUSLY:
1. That conditional permission be granted, subject to the views of the Mayor of London and subject to a S106 legal agreement to secure the following planning obligations:
a) A financial contribution of £157,280 (index linked) towards the Carbon Off Set Fund (payable prior to the commencement of the development);
b) 'Be Seen' monitoring and reporting on the actual operational energy performance of the building, including as-built and in-use stage data;
c) A financial contribution of £257,473.50 (index linked) towards initiatives that provide local employment, training opportunities and skills development and supporting the Westminster Employment service (payable prior to the commencement of the development);
d) An Employment and Skills Training Plan;
e) Travel Plan and associated monitoring costs;
f) Potential Highways Works and associated costs (e.g. loading bay works, relocation of taxi bay and provision of short stay cycle parking);
g) All costs associated with stopping up parts of the highway;
h) The costs of monitoring the S106 agreement.
2. That if the S106 legal agreement has not been completed within six weeks of the date of this resolution, then:
a) The Director of Town Planning and Building Control shall consider whether it will be possible or appropriate to issue the permission with additional conditions attached to secure the benefits listed above. If so, the Director of Town Planning and Building Control is authorised to determine and issue the decision under Delegated Powers; however, if not;
b) The Director of Town Planning and Building Control shall consider whether the permission should be refused on the grounds that it has not proved possible to complete an agreement within an appropriate timescale, and that the proposals are unacceptable in the absence of the benefits that would have been secured; if so the Director of Town Planning and Building Control is authorised to determine the application and agree appropriate reasons for refusal under Delegated Powers.
3. That the Committee authorised the making of a draft order pursuant to s247 of the Town and Country Planning Act 1990 for the stopping up of parts of the public highway and creation of new public highway to enable this development to take place. That the Director of Town Planning and Building Control, Executive Director of City Management, or other such proper officer of the City Council responsible for highway functions, be authorised to take all necessary procedural steps in conjunction with the making of the orders and to make the orders as proposed if there are no unresolved objections to the draft orders. The applicant will be required to cover all costs of the Council in progressing the stopping up orders.
4. That the following informatives be added:
a) That the Applicant be urged to consider the use of Electric Vehicles for servicing;
b) That the Applicant make use of freight consolidation; and,
c) That the Applicant consider the introduction of a plaque in commemoration of the Fenwick’s department store which previously occupied the site.
Supporting documents: